Parking Lot Striping & Sealcoating in North Myrtle Beach, SC

Resort, Condo and Retail Lots Kept Sharp All Season

North Myrtle Beach is packed with oceanfront condos, resort communities, golf courses and busy retail along Highway 17. Those lots carry heavy summer traffic and take constant sun and salt air. CGC Surface Solutions restripes, seals and repairs lots from Cherry Grove and Ocean Drive to Windy Hill and the Barefoot area.

Our crew is based just up the road in Little River, so assessments are quick and we can schedule around check-ins, tee times and store hours. Call or text (843) 938-0201.

Parking lot striping Myrtle Beach

Why North Myrtle Beach Properties Choose Us

  • Minutes away from our Little River base for fast scheduling
  • Resort and condo experience with phased work so guests can still park
  • Pre-season booking from January through March
  • Golf and clubhouse lots striped around tee times and events
  • Coastal-grade sealer and paint chosen for sun and salt air
  • Fixed written quotes after a free on-site assessment

Parking Lot Services in North Myrtle Beach

Striping & Restriping

Stall lines, numbering, arrows and loading zones for condos, resorts and shopping centers. Line striping →

Asphalt Sealcoating

Sealer that blocks sun, rain and salt damage and restores a clean black finish. Sealcoating →

Crack Repair

Crack filling and patching before summer storms open them into potholes. Repairs →

ADA Parking

Accessible stalls, aisles, symbols and signs. ADA compliance →

Garage & Deck Striping

Directional markings and stall lines for condo parking garages and decks.

Wheel Stops & Signs

North Myrtle Beach Parking Lot FAQs

How quickly can you come out?

We are based in Little River, a short drive from North Myrtle Beach, so most assessments happen within a few days.

Can you work at a condo without closing the lot?

Yes. We stripe and seal in sections and can provide notice text for owners and guests.

When should resort lots be refreshed?

Before the season. We book pre-season work January through March.

Do you stripe parking garages?

Yes. We mark stalls, arrows and drive lanes in parking garages and decks.

How long does sealcoating last near the ocean?

Most coastal lots need resealing every 2 to 3 years because of sun and salt exposure.

Do you work with HOA boards?

Yes. We provide written scopes, photos and fixed pricing for board approval. For HOAs →

Get Your North Myrtle Beach Lot Ready

Free lot assessment with photos and a written quote. Call or text (843) 938-0201.